Completing Construction in Ireland: Final Finishes and Moving In

When the main building works are finally done, it might seem like the hardest part is behind you. But don’t relax just yet—here in Ireland, the final stage isn’t just about picking nice wallpaper or comfy furniture. There’s a specific procedure involving final inspections, certifications, and plenty of small details that, if overlooked, could cause frustrating delays right at the finish line.

In this article, I’ll explain exactly what you need to do, how to successfully navigate the final inspections, and how to quickly obtain all the necessary documents to move in without issues.


1. Final Finishes: Where Not to Cut Corners

By this point, you probably can’t wait to move in—but rushing things can be a costly mistake. Planning your finishes carefully upfront means you won’t have to redo them later.

Important things to consider:

  • Materials for finishes
    Humidity in Ireland is always high, so cheap paints or substandard plastering will quickly deteriorate. Choose moisture-resistant paints and finishes specifically designed for damp climates.
  • Flooring
    Laminate or hardwood might look good, but make sure they’re resistant to moisture and temperature fluctuations common in Ireland. Luxury Vinyl Tiles (LVT) and engineered wood flooring usually hold up better here.
  • Bathroom finishes
    Never underestimate waterproofing and ventilation. Even minor oversights can lead to mould and costly repairs within a year or two.
  • Lighting and electrics
    Think carefully about the number and position of sockets, switches, and lighting. Electrical work must be done by a registered electrician who can issue the required RECI Certificate.

2. What Will Inspectors Check in the Final Inspection?

Before you officially move in, your home will undergo a final inspection. This is typically the moment when problems surface if the house wasn’t closely supervised during construction.

Here’s what inspectors usually focus on:

  • Overall structural condition
    Inspectors check foundations, walls, and roofing for any damage, cracks, or leaks. It’s a good idea to do your own pre-inspection with your contractor beforehand, saving time on any needed fixes.
  • Energy efficiency and insulation
    A BER (Building Energy Rating) certificate is mandatory in Ireland. Poor insulation, incorrect heating installation, or subpar windows can cause serious headaches and delays during certification.
  • Electrical wiring and plumbing
    Your electrical wiring, RCD units, circuit breakers, and plumbing systems must be correctly installed and safe. Any issues like leaks or improper installation will lead to delays.
  • Compliance with approved plans and permits
    Any changes made during construction must have prior approval. Unapproved modifications might cause difficult conversations or even refusal of your final certificates.

Tip: Consider hiring your own inspector before the official visit. You’ll have time to fix any issues they find before it’s too late.


3. Essential Documents You’ll Need

Finishing a home isn’t just about paint and fixtures—it’s about paperwork too. In Ireland, you’ll need the following documents to officially occupy your house:

  • Certificate of Compliance
    Issued after a successful final inspection, this confirms your home meets all Irish standards and regulations.
  • BER Certificate
    Without this energy rating certificate, you cannot sell or rent out your home. Arrange a BER assessment early to avoid last-minute stress.
  • RECI Certificate (Electrical Certificate)
    This confirms your electrical system is installed safely and correctly. It must be signed by a registered electrician.
  • Warranty documents for equipment and systems
    Keep warranties for boilers, pumps, windows, and any major equipment installed—these are essential if selling or for future inspections.

4. Common Mistakes During Final Stages (And How to Avoid Them)

Typical pitfalls that waste time and money:

  • Ignoring minor defects
    A small wall crack or a poorly fitted door might seem trivial but can significantly delay sign-off by inspectors.
  • Turning on the heating too soon
    Walls and floors need to be fully dry before starting heating. If you rush this, trapped moisture could cause persistent mould problems.
  • Lack of proper ventilation
    Ensure proper ventilation in every room, especially kitchens and bathrooms. Without it, you’ll face continuous moisture and mould issues.
  • Cutting corners on professional advice
    The final stages demand attention to detail and experienced professionals. Never skimp on consulting architects or engineers—doing so often leads to costly fixes.

5. Final Tips for a Smooth Move-In

Before officially occupying your home, thoroughly inspect every room—from sockets and switches to flooring and plumbing fixtures. Creating a detailed checklist beforehand means you won’t overlook anything critical.

Pay special attention to sealing around windows and doors, test plumbing fixtures carefully, and check heating thoroughly. Spending a full day inspecting now is far better than constantly fixing small issues later.


Conclusion

The final stages of construction are not merely a formality—they’re crucial to turning your property from a building site into a comfortable, livable home.

Take your time and get everything done properly. This will save you stress, money, and, most importantly, allow you to officially and smoothly move into your new home in Ireland without delays.

If you still have questions or need help with your final finishes or documentation, just get in touch. Together we’ll find the perfect solution tailored exactly for you.

Scroll to Top